Project Title: Construction of Thaba-Nts'o-Moiketsi Footbridge Client: Roads Directorate Contract Type: Prime Contract Contract Value: M1,077,476.96
Introduction: The construction of the Thaba-Nts'o-Moiketsi Footbridge, undertaken as a prime contract by our company for the Roads Directorate, aimed to enhance connectivity and safety by providing a pedestrian crossing over a busy road. This case study highlights the key aspects, challenges, and successful outcomes of the project. Project Scope: The scope of the project involved the design, engineering, and construction of a footbridge to facilitate safe passage for pedestrians. The footbridge was strategically located to provide a convenient crossing point, improving accessibility and reducing the risk of accidents for pedestrians.
Share